How is this best done? We don't want to mess up the insulation cavities of the studwall by doing between-stud blocking, thus we need outside-the-sheathing horizontal furring.
How ya gonna get a drainage plane thing going with those furring strips providing dams at regular intervals?
Kerfing the furring strips sounds like a nutty and expensive thing to do.
Is there a solution? Do the gaps between the boards provide enough weep for everything?
How ya gonna get a drainage plane thing going with those furring strips providing dams at regular intervals?
Kerfing the furring strips sounds like a nutty and expensive thing to do.
Is there a solution? Do the gaps between the boards provide enough weep for everything?
Comment