    How does one construct a 2 hour fire rated ceiling/floor combination?

    I have been told this is a necessity in a building I am about to purchase, but I do not know how to spec it out!

    Thanks.

  • #2
    Re: 2 hour fire rated ceiling

    Go to USG.com. They have several drawings and expanations on how to achieve a 2 hour rating when needed.

    Comment


    • #3
      Re: 2 hour fire rated ceiling

      The ceiling will need 2 layers of 5/8 drywall attached to steel resilient channel. If the floor also needs a 2 hr rating, acording to USG's handbook it will need a 1 1/2 " gypsum concrete flooring.
      Your code enforcer should be able to advise you on this if the job spects don't have the necessory imformation.