I'm remodeling a garage into a home office. Client wants office to be as tight and quiet as possible. We only have 2x4 walls to work with, and the exterior is stucco. I'm thinking about sheathing the interior with 1/2" ply or osb (after insulating of course) and then following that with sheetrock. Would it be worth it? Would two layers of rock be better? I'm posting this on building science also, so don't tell me to. :)
Aaron
PS. I've also heard that running a bead of rubber (rubber caulk?) on the studs helps because it cuts down on sound transmission through the physical connections. (drywall-stud-siding) Has anyone had any experience with this sort of technique?